Advanced Passenger Train (APT-400)


A new, very high speed, North-South rail link

Introduction

The Advanced Passenger Train (APT) will be introduced into fleet service in approximately 1976, working to a top speed of 125-155 mile/h on existing tracks. It is proposed that this concept should then be developed to be capable of speeds of 300 Km/h and then 400 Km/h. This, however, would require new route alignment, new track and new facilities.

Basic Assumptions


Routes

APT-400 Routes

Route One

Route 1 is a straight line joining Glasgow and London. The physical barriers to such a route are considerable; it passes diagonally through the Peak District and Pennines (145 Km) and the Lake District (55 Km) and crosses the Solway Firth where it is approximately 12.5 Km wide. There are also 55 Km of high ground to be crossed in Scotland.

Cities Served
Bradford
Derby
Glasgow
Leicester
London
Nottingham
Sheffield
Cities Almost Served
Coventry
Manchester
Stoke
Cities Not Served
Birmingham
Edinburgh
Hull
Leeds
Liverpool
Newcastle
Sunderland
Teesside
Wolverhampton

 

Distance
Km
Journey Time
Non-Stop minutes
London - Start 0
Coventry/Leicester 138 Pass 22
Derby/Nottingham 181 " 28
Stoke/Sheffield 225 " 35
Manchester/Bradford 263 " 40
Glasgow 558 Stop 86

Route Two

Route 2 is laid out to serve as many cities as possible en route. Although laid out simply as a series of straight lines, account has been taken of the major hill crossings. No survey has been carried out but it is assumed that the line can be constructed to 400 Km/h standard virtually throughout.

Cities Served
Birmingham
Bradford
Coventry
Edinburgh
Glasgow
Leeds
London
Manchester
Newcastle
Stoke
Sunderland
Teesside
Wolverhampton
Cities Almost Served
Derby
Leicester
Cities Not Served
Hull
Liverpool
Nottingham
Sheffield

 

Distance
Km
Journey Time
Non-Stop minutes
London - Start 0
Birmingham/Wolverhampton/Derby/Coventry/Leicester 160 Pass 28
Stoke 221 " 37
Manchester 293 " 48
Leeds/Bradford 339 " 55
Teesside 426 " 68
Newcastle/Sunderland 473 " 75
Edinburgh 645 " 101
Glasgow 709 Stop 111

Liverpool, Sheffield and Nottingham could be connected into the APT-400 service by conventional APTs operating in both directions on a circuit Liverpool-Manchester-Sheffield-Nottingham-Birmingham-Liverpool.

Route Three

Route 3 may be described as the most direct practicable route from London to Glasgow. Its length is only some 28 Km longer than that of the "theoretical" Route 1. The alignment is approximately along the West Coast Main Line as far as Abington thence direct to Glasgow rather than via Carstairs.

Can also serve the heavily populated parts of Lancashire from Manchester to Preston including the proposed Central Lancashire new city. Connections at Carlisle for the North-East.

Cities Served
Birmingham
Coventry
Glasgow
London
Manchester
Stoke
Wolverhampton
Cities Almost Served
Derby
Leicester
Cities Not Served
Bradford
Edinburgh
Hull
Leeds
Liverpool
Newcastle
Nottingham
Sheffield
Sunderland
Teesside

 

Distance
Km
Journey Time
Non-Stop minutes
London - Start 0
Birmingham/Wolverhampton/Derby/Coventry/Leicester 160 Pass 28
Stoke 221 " 37
Manchester 278 " 46
Carlisle 438 " 70
Glasgow 586 Stop 92

Notional Timetable

A frequency of four trains/hour either way is considered a reasonable service to aim for. It is assumed that two of the four trains every hour will stop at only major stations viz Birmingham, Manchester and Newcastle, while the other two will stop at all the seven intermediate stations. A stop time of one minute is allowed at all stations except at Newcastle for down trains and at Manchester for up trains where the semifast trains have to wait for eight minutes to let the fast train overtake them.

The first timetable is written assuming the route will consist entirely of newly laid track while the second one assumes that existing track will be used for going into and coming out of Birmingham New Street and Manchester Victoria.

London - Glasgow (Down Direction)

Route 2 - New Construction Throughout
London d 06.00 06.08 06.30 06.38 07.00 etc
Birmingham d 06.30 06.38 07.00 07.08 07.30
Stoke d 06.53 07.23
Manchester d 06.56 07.10 07.26 07.40 07.56
Leeds d 07.23 07.53
Teesside d 07.42 08.12
Newcastle a 07.54 08.24
d 07.29 08.02 07.59 08.32 08.29
Edinburgh d 08.34 09.04
Glasgow a 08.09 08.48 08.39 09.18 09.09

Glasgow - London (Up Direction)

Route 2 - New Construction Throughout
Glasgow d 06.00 06.08 06.30 06.38 07.00 etc
Edinburgh d 06.23 06.53
Newcastle d 06.41 06.55 07.11 07.25 07.41
Teesside d 07.08 07.38
Leeds d 07.27 07.57
Manchester a 07.39 08.09
d 07.14 07.47 07.44 08.17 08.14
Stoke d 08.04 08.34
Birmingham d 07.40 08.19 08.49 08.40
London a 08.09 08.48 08.39 09.18 09.09

London - Glasgow (Down Direction)

Route 2 - Via Birmingham New Street & Manchester Victoria
London d 06.00 06.08 06.30 06.38 07.00 etc
Birmingham d 06.33 06.41 07.03 07.11 07.33
Stoke d 06.59 07.29
Manchester d 07.03 07.17 07.33 07.47 08.03
Leeds d 07.31 08.01
Teesside d 07.50 08.20
Newcastle a 08.02 08.32
d 07.37 08.10 08.07 08.40 08.37
Edinburgh d 08.42 09.12
Glasgow a 08.17 08.56 08.47 09.26 09.17

Glasgow - London (Up Direction)

Route 2 - Via Birmingham New Street & Manchester Victoria
Glasgow d 06.00 06.08 06.30 06.38 07.00 etc
Edinburgh d 06.23 06.53
Newcastle d 06.41 06.55 07.11 07.25 07.41
Teesside d 07.08 07.38
Leeds d 07.27 07.57
Manchester a 07.40 08.10
d 07.15 07.48 07.45 08.18 08.15
Stoke d 08.06 08.36
Birmingham d 07.45 08.24 08.15 08.54 08.45
London a 08.17 08.56 08.47 09.26 09.17

Non-stop times for the two cases
All new track:- London-Glasgow 111 mins
Via New Street & Victoria:- London-Glasgow 124 mins

In both cases the service can be provided with 26 trains and allowing for four spare units, a fleet of 30 trains will suffice. In the first case a turn-round time of 51 minutes is allowed while in the second case turn-round time is about 42 minutes.

British Railways Research Department APT Design Group © November 1971